Friday, September 3, 2010

WO&D I-66 bridge (no closings expected)

This from the Friends of the WO&D:

"As part of the Capital Beltway HOT Lanes project, a new W&OD Trail bridge -- to the north of the old one -- is currently under construction. The existing bridge and the Trail itself will remain open, but bridge abutment walls are being put in place on both sides of the Beltway, so that users are advised to exercise special caution in this work zone. The beams of the new bridge are scheduled to be installed in October, and the deck in November. Once this new bridge is completed and opened to users, the old one will be removed."

No comments:

Post a Comment

Post links to your maps/routes on Bicycling.com (Trimble Outdoors) or MapMyRide.com and I'll embed them in a new post.

Post other links & I'll add them to the link file.